Leave a Message

Thank you for your message. We will be in touch with you shortly.

Explore Our Properties
The Prospect Avenue Rewrite: What's Actually Changing Downtown This Fall

The Prospect Avenue Rewrite: What's Actually Changing Downtown This Fall

Walk from the Metra platform to Page's on a Wednesday morning and the street looks about the same as it did last September. Same brick fronts, same short block, same coffee line spilling onto the sidewalk. The changes are in the paperwork, and most of them land between now and next spring.

I've been tracking the village board minutes and weekly manager reports the way I track new listings, because the two are more connected than they look. What happens on Prospect Avenue over the next twelve months will shape resale conversations on Norfolk, Walker and Chicago Avenue for years.

The thesis in one sentence

The story downtown isn't a single restaurant opening. It's the village spending downtown TIF dollars on the street itself for the first time in a long time, while the storefront turnover finally catches up with what residents have been asking for. Those two things reinforce each other, and if you own a home within walking distance of the station, that combination matters more than any single lease.

Here is the piece most residents I talk to have missed: village staffers presented a plan for downtown improvements over four years, paid for through downtown's special tax district, and under the proposal, the village would spend nearly $1.2 million in the first year on bollards and hardscape upgrades, with construction set for the fall. That is not signage or planters. That is real infrastructure money going into the public realm on Prospect.

Why the plaza plan turned into bollards

You may remember the pushback earlier this year. Trustees had proposed replacing a traffic triangle on Prospect Avenue with a plaza designed for public events, and for months residents protested the idea, saying it would cause traffic problems downtown. The compromise adds retractable bollards and hardscape improvements such as pavers instead of closing the triangle permanently.

The practical translation: the street stays a street on ordinary Tuesdays, and becomes a walkable event surface on concert Wednesdays and festival Saturdays without the orange barrels. If you have watched Dancin' in the Street get set up and torn down every summer, you already understand what the village is buying. It's flexibility, not a plaza.

What's actually landing at street level

Two storefronts tell the story of downtown Clarendon Hills right now, and they tell it in opposite directions.

The good news first. Rita's Ice is coming to 22 S. Prospect Ave., with staff and the Chamber of Commerce having worked closely with the operator to target this mid-block business location, and an ice cream vendor has been top of the list for downtown Clarendon Hills. The operator earned the slot by showing up as a temporary vendor last year, which is a rare thing to see in a suburban downtown that usually recruits by cold call.

Then there is the saga at 27 S. Prospect. The proposed Prospect Tavern has been the "coming soon" that never quite comes. In late January the business signed an agreement for a subsidy from the village's downtown TIF district, then failed to get any permits or submit any construction documents. The board voted unanimously in April to allow the village to resolve the matter with the owner, and trustees spoke about possibly reducing the $265,000 subsidy and setting milestones for the project. By May, the story had turned again. The acting village manager said Prospect Tavern remained in default of the agreement, which called for a $265,000 subsidy for the renovation at 27 S. Prospect Ave.

The building itself has a longer memory than the current headlines. It was most recently occupied by La Pearl and I Want Candy, but has been mostly vacant since Sue's Cakery closed in 2019. Six years of dark windows on a mid-block corner is the kind of thing that quietly shapes how a downtown feels, and it explains why the village keeps trying to make a deal work rather than reopening the RFP.

A block-by-block scorecard

Address Was Next Status as of summer 2026
22 S. Prospect Ave. Temporary vendor slot Rita's Italian Ice Permit plans in review
27 S. Prospect Ave. Sue's Cakery, then La Pearl and I Want Candy Prospect Tavern (proposed) Subsidy in default, village weighing next step
20 S. Prospect Ave. The Open Door Taproom and Bottleshop Same Operating
Prospect Ave. streetscape Traffic triangle and standard curb Retractable bollards, pavers, hardscape First-year construction planned for fall

I keep this table on my phone because clients ask about it. The pattern is easier to see when the addresses sit next to each other. Two mid-block spaces cycling, one taproom holding steady, and the street around all of it getting rebuilt.

The bigger footprint on the horizon

If the storefronts are the small strokes, Parkside Place is the wide brush. At a June 2025 zoning hearing, the developer presented the proposed project, Parkside Place, as a 4-story mixed-use development with a small public park on the corner, primarily luxury condominiums for sale only, no rentals, featuring a luxury boutique hotel, with no bar or restaurant proposed, and the applicant would be the owner-operator of the retail components and the boutique hotel.

Neighbors pushed back on scale and traffic. A neighbor stated that the entrance shown on Walker might not be the best thing with the traffic for the Walker school traffic. Another resident said he'd prefer a three-story concept and didn't understand the roof line shown. The financial questions were sharper still. A resident cited numbers in the proposal showing a net loss of $503,470, only profitable if $1.8 million of TIF money is allocated, for a developer profit of $1.296 million.

Whatever happens with Parkside Place, the debate itself tells you something about where downtown is heading. The village has one TIF district and multiple hands out. Rita's is small. The tavern is medium. A boutique hotel with for-sale condos is a category change. Watch which one the board funds, and in what order, and you'll know more about the next five years of walkability on Prospect than any comp report can tell you.

What still feels the same

The rituals that make the downtown feel like the downtown are running on schedule. The summer concert series takes place on Prospect Avenue from Park Avenue to Burlington Avenue, 7 to 9 p.m. each Wednesday from July 8 through August 12 for the 2026 series. A few markers to keep on the calendar as the season wraps:

  • Dancin' in the Street Wednesdays, through August 12
  • Touch-A-Truck, Friday, August 7, 10 a.m., at 315 Chicago Ave.
  • Farmers Market Saturdays at Village Hall, 1 N. Prospect Ave.
  • Daisy Days in the fall, the traditional bookend to the concert season

If you moved here in the last two years, the concert crowd is the best free scouting report on the downtown you can get. Stand on the sidewalk between Party on Prospect and Za Za's around 8:15 p.m. and count how many people wave at each other. That number is the reason the bollard project matters. The village is building the street for the way residents already use it.

What this means if you own a home here

Two things quietly shift when a downtown reinvests in its own public realm. First, walkability premiums stop being a soft talking point and start showing up in appraisals, because comparable sales along the Metra spine begin to reflect what the buyer can actually walk to. Second, uncertainty gets priced in on the way through the construction, then priced out on the other side. Sellers who list into the middle of a fall streetscape build will feel the noise. Sellers who time a spring launch after the pavers are in will benefit from photos that finally match the story the listing description has been telling for years.

That is the calendar conversation I'm having with owners on Norfolk, Ann and Chicago right now. If you're planning a 2027 move, the choice between a late-fall 2026 launch and a March 2027 launch is not a coin flip this cycle. It's a read on the construction schedule and the Rita's opening and, honestly, on whether 27 S. Prospect has lit windows by then.

If you want to talk through where your block sits relative to all of this, and what a Coming Soon window looks like against the downtown build, I'm at The Casselyn Group. Send me your address and I'll pull the walking-distance comps and a candid read on timing. No pitch, just the map I use when I'm deciding what to tell my own clients.

Get Your Instant Home Valuation at casselyngroup.com and I'll follow up with the block-level context the automated number can't give you.

Work With Us

Finding a home is a very intimate process, and we want you to know we will be there for you, not only during the home selling/purchasing process but for anything your future may hold. We are here to help you with all your real estate needs, whether it is just a question or help to sell/find a home, feel free to contact us at any time!

Follow Me on Instagram